Material: | Steel Structure |
---|---|
Usage: | Warehouse, Villa, Dormitories, Temporary Offices, Workshop |
Certification: | ISO |
Customized: | Customized |
House Body: | Steel Structure Wall and Roof |
Basic Accessories: | Door Window Canopy and Trim&Flashing |
Customization: |
---|
Suppliers with verified business licenses
Weifang Tiemeng Steel Structure Co.,Ltd is a professional manufacturer of Prefab House,Container House and Light Steel Structure etc.Our factory has passed SGS Factory Evaluation and ISO9001:2008 Quality Certification.We are looking forward to cooperating with you for long term business relationship.
K-type Prefab House
1.Definition: It is a kind of prefab house built by sandwich panels.
The sandwich panels insert to the light steel structure frame horizontally.
The standard room has two size:6.16m*1.82m/K and 5.62m*1.82m/K
2.Characteristic: A.Fireproof and Shockproof
B.Heat Preservation and Sound Insulation
C.Beautifu Apperance and Envirenmental Protection
D.Quick and Easy Disassembly.Repeated Usage.
3.Application: A.Road and Railway Construction Site
B.Temporary Office/Project Department
C.Temporary Dormitory
D.Sales Office
E.Clinical Reception/Emergency Treatment
F.Short-term Civil Housing Construction
G.the Army Camp
H.the Refugee Camp
4.Components: A.80*40 Section Steel(80*40 C-type Steel) is used for the above components.
1) Grade Beam
2) Ring Beam
3) Column
4) Corridor Holder
5) Beam Frame(Flat Beam Frame/Triangle Beam Frame)
6) Purline
B.The wall panel is a kind of composite board which is 50mm rock wool sandwich between two steel sheets.Its effective width is 950mm.
C.Door : 1950*930
D.Window: 1740*930
E.Floor: 15mm wood board
F.Brace: 8mm rond steel bar
5.Manufacturing Process:
A.Steel Frame Manufacturing Process
1) Purchasing Steel Strip
2) Press into C Section Steel
3) Welded Component
4) Connet into a Frame
B.Sandwich Panel Manufacturing Process
1) Purchasing Coiled Material
2) Galvanized Coating
3) Laying Bottom Sheet
4) Laying Rock Wool
5) Laying Top Sheet
6) Mechanical Glue
7) Set the Cutting Length as Required.
8) Pressed into Sandwich Panel
6.Installation Process:
A.Laying the Grade Beam
B.Connect the Grade Beam to the Concrete Foundation.
C.Connect the Columns to the Grade Beam
D.Connect the Beam Frame to the Columns
E.Connect the Purline and Ring Beam to Beam Frame.
F. Installating the Wall Panel to the Steel Frame.
G.Installating the Roof Panel.
H.Installating the Doors and Windows.
I.Tightening the Brace.
J. The Prefab House Be Constructed.
7.Schematic Diagram of Prefab House Foundation:
A.Remark:this Diagram is not Proportional
B.The Interior Floor is 50mm Higher than the Concrete Foundation.
C.This Foundation is only Suitable for Solid Soil.
If it's Loose Soil,the owner should increase the Foundation Section Area.
D.Material:C20 Concrete
FAQ:
Q: Are you a factory or trading company?
A:We are a factory who have more than 10 years experience on container houses' production.
Q: What's the payment way?
A:T/T ,LC and so on.
Q: What's your supply capacity?
A:Annual Production: container house 72000sets,prefab house 564000square meters;portable toilet 24000sets;
steel structure 360000square meters .
Q:How to install ?
A:We will provide installation instruction and video for you, technicians will be sent to help you if it is necessary. However, the visa fee,
air tickets, accommodation,wages will be provided by buyers.
Q: How long is your delivery time?
A:Generally it is within10-30 days ,definitely according to quantity and color.
Q: How do you guarantee the quality of the products?
A:Strict product quality control,quality makes the future.This is the tenet of our factory.Each product from
our factory has strict testing procedures, and must be 100% qualitybefore delivery.
Q: How canIget the quotation of the project ?
A:If you have drawing ,we can offer you our quotation according to your drawing .
Suppliers with verified business licenses